What you send and what you get
What to send
| Item | Filing only | Full dossier |
|---|---|---|
| Customer name, installation address and postcode | Needed | Needed |
| MPAN (13 digits, on the bill) | Needed | Needed |
| Your company and accreditation details | Needed | Needed |
| Each inverter and battery: make, model, rating, quantity, type test register reference | Needed | Needed |
| Existing generation or storage on the same supply | Needed | Needed |
| Single line diagram | Needed for G99 fast routes with export limiting; send it whenever you have it | Needed |
| Clear photo of the cut-out and meter, showing the fuse rating | Needed | Needed |
| Commissioning date and test readings | When commissioned | Needed |
| Contract date, price, MCS scheme and technical supervisor | Not needed | Needed |
| Roof layout, orientation, pitch, shading, performance estimate | Not needed | Needed for solar |
| A letter of authority signed by your customer | If your network operator asks for one | |
Nothing has to be complete on the first send: we reply with the list of what is missing.
What you get back
Network operator filing, £60
- G98: the commissioning notification (Form B) filled in.
- G99: the application (Form A1-1 or A1-2) and, once commissioned, the installation document (A3-1, A3-2 or A3-3); G100 export limitation papers where the scheme needs them.
- A check that the forms agree with your diagram and equipment references, with anything inconsistent listed.
- Corrections of our own mistakes, and help answering the operator's questions about what we prepared.
Full dossier, £120
- Everything in the filing.
- The fields the MCS database asks for, gathered in one sheet: dates, technology, products and quantities, capacity, estimated annual generation, grid connection type, meter details and, for batteries, coupling, power and capacity.
- A handover pack for your customer: contractor and client details, key components, performance estimate, commissioning records, maintenance guidance, manuals and warranties you send us, and a place for the MCS certificate you raise.
What is not included
- Electrical design, structural surveys, or drawing a diagram from nothing.
- Network operator charges or reinforcement works.
- Raising the MCS certificate, which is your own declaration, and its fee.
- Building regulations notification, insurance backed guarantees, and certificates only you or a third party can issue.
- Installations above 50 kW or outside Great Britain.
Who does what
| Step | Who |
|---|---|
| Design, install, test and commission | You |
| Send site data, documents and your customer's permission | You |
| Prepare the forms and packs, list what is missing | GridDossier |
| Review, sign the declarations and stay the installer of record | You |
| Submit to the operator | You, or us with your written authority where the operator accepts it |
| Assess the application and answer | Network operator |
| Raise the MCS certificate | You |